China Life Insurance Building - Project Management
China Life Insurance Building - Project Management
China Life Insurance Building - Project Management

The project is a large-scale comprehensive public construction project invested and constructed by the Zhejiang Branch of China Life Insurance Co., LTD. It is located in the core CBD area of Qianjiang New City, Hangzhou City, adjacent to the Hangzhou Civic Center across the street. The building design consists of three high-rise buildings (the main business building, the secondary business building and the training center building), as well as their podiums and basements. Concrete-filled steel tube frame - reinforced concrete core tube structural system. Among them, the main business building has 42 floors above ground and a height of 189.7 meters. The 39-story business annex building has a height of 175.6 meters. The training center building has 32 floors and a height of 136.15 meters. The podium has 5 to 6 floors and the basement has 5 floors.


The company provides project management services. The main measures and achievements include:


In terms of comprehensive management of approval and construction application, we made overall arrangements, closely advanced the pre-construction management of the project, completed all procedures and work as planned, and officially started the project on schedule. In 2018, we completed the filing work for planning acceptance, special acceptance of outdoor greening, and special acceptance of civil air defense projects.


In terms of design management, due to the adjustment of the construction unit's own industry policies in the early stage of the project, in order not to affect the construction period target, the Department of the Whole Process Engineering Consulting Management dispatched professional personnel to the design institute for coordination and promptly resolved the problems encountered in the design process, completing the construction drawing design 25 days ahead of schedule. Strengthen design management, put forward over 500 review opinions on drawings (including reasonable suggestions), covering all specialties, and reduce subsequent rework and claims. By putting forward reasonable suggestions and optimizing the design, approximately 120 million yuan of investment was saved.


3. Promote the bidding and procurement work in a reasonable and scientific manner. The "Bidding and Procurement Management Measures" were formulated to implement hierarchical control over bidding and procurement. Planning suggestions for the division of bidding sections and the classified contracting of specialized projects were proposed to the project entrustors. All bidding and procurement work was advanced in an orderly manner. Through the review of the bidding control prices compiled by cost consulting companies, a cumulative net reduction of over 30 million yuan was achieved, and the control effect of saving investment was realized during the bidding stage.


4. Investment control and management measures. Prepare the funding plan for the project implementation, and manage and pay the progress funds of the project. Apply advanced engineering valuation methods to compile and decompose the "Project Cost General Control Plan", and establish a project cost pre-control system. Comprehensively assess the impact of technical changes proposed by all parties on design, construction period, cost and later operation, and control design changes that affect construction period and cost. At all stages of design, strengthen the control of design estimates and implement limit design management. Track and manage the implementation of investment estimates during the construction phase. The overall investment throughout the entire process of the engineering construction is controlled within the range of the investment estimate.


5. Progress plan management measures. Prepare the construction progress control plans for the overall project and each individual project, and on the basis of these plans, establish two planning systems, namely the internal monthly/weekly planning system. Urge all parties involved in the construction to formulate their respective work plans in accordance with the requirements of the above-mentioned overall progress control plan, making them coordinate with each other to form a three-level progress planning system. Supervise and inspect the implementation of various plans. The consulting unit should give full play to its professional advantages to uniformly manage all on-site construction units. Regularly organize project leader meetings to analyze the implementation of the progress plan, correct deviations, and track the implementation to ensure the realization of the overall progress control plan.


6. Engineering quality management measures. Formulate the quality objectives and working system of the project, organize the participating construction units to establish a quality assurance system, and after the design unit completes the preliminary design, prepare the preliminary quality control implementation plan. After the completion of the construction drawing design work, update and deepen the quality control implementation plan, and conduct quality management of the project in accordance with the latest approved quality control implementation plan. The quality objective of this project is to ensure the "Lu Ban Award". During the project implementation stage, organize all participating construction parties to conduct regular on-site inspections. Based on the evaluation requirements of the Lu Ban Award and in combination with the on-site effectiveness, evaluate the design results of the special project Improve project construction and ensure project quality.


The main honors received include:

The project met the requirements of the double-standard construction site in Zhejiang Province, achieving zero quality and safety accidents. In 2014, it was awarded the title of "Fourth Batch of National Green Construction Demonstration Project in the Construction Industry" by the China Construction Industry Association with a high score.

2. In 2017, it was awarded the "China Steel Structure Gold Award" by the China Building Metal Structure Association.

3. In 2017, it was awarded the title of Demonstration Model Project at the Annual Conference of Engineering Quality Supervision Work in the East China Region.

In 2018, it was awarded the "West Lake Cup" (Structural Quality Award) for construction projects in Hangzhou City.


  • Service Content

    Project management and agency construction

  • Project location:

    杭州市江干區錢江新城

  • Construction unit:

    中國人壽保險股份有限公司浙江省分公司

主站蜘蛛池模板: 久久久久久999| 波多野结衣电车| 蜜臀一区| 一级久久久久久久| 成年人国产视频| 青青艹在线视频| 国产男女爽爽爽| 婷婷色中文网| 人人干av| 久久五月精品| 亚洲av永久中文无码精品综合| 中国gay猛男gay同志| 少妇免费毛片久久久久久久久 | 婷婷影院在线观看| 我被下药做得好爽| 毛茸茸日本熟妇高潮| 超碰在线色| 婷婷色五| 德国艳妇丰满bbwbbw| 精人妻一区二区三区| 男人操女人下面| 在线日韩免费| 日日噜噜噜| 欧美亚州| 国自产拍偷拍精品啪啪模特| 性教育老师hd| 波多野结衣91| 一区二区三区四区高清视频| 亚洲图片综合网| 9.1成人看片| 久久69av| 欧美h在线观看| 337p粉嫩大胆噜噜噜噜69影视| 国产又色又爽又黄的| 日本乱偷中文字幕| 山村性事| 日本一级二级视频| 丝袜一区二区三区| 亚洲区综合| 免费黄网在线观看| 精品欧美一区二区三区在线观看| 成年人视频大全| 日本少妇电影| 午夜剧场91| 无码国产精品高潮久久99| 五月丁香啪啪| 日韩avv| 久久99精品久久久久| 色呦呦app| 国产美女明星三级做爰| 20个少妇口述与子做过| 变态孕交videosgratis孕妇| 日韩毛片中文字幕| 午夜精品一区二区在线观看的| 班长露出强行被男生揉| 国产7777| 夫妻黄色录像| 涩涩屋视频| 成人性色视频| 欧美xxxx少妇| 在线观看国产视频| 亚洲精品无amm毛片| 国产91福利| 三上悠亚痴汉电车| 欧美色女人| 成人午夜免费av| 91精品啪在线观看国产| 黄色综合网站| av在线不卡网站| 黄污在线观看| 理论片在线视频| 免费日韩精品| 国产igao激情视频入口| 成人免费在线看片| 日韩五十路| 美色视频| 亚洲免费播放| 日本一区二区在线电影| 狂野欧美性猛交xxxx| 天天综合网91| 乱色精品无码一区二区国产盗| 中文字幕一区二区人妻电影| 色狠狠操| 在线亚洲一区| 人妻一区二区三区四区五区| 久久久久中文| 久久不卡日韩美女| 日美一级片| 女生被男生操网站| 好吊操精品视频| 激情艳女| 办公室荡乳欲伦交换bd电影| 亚洲精品中文字幕在线观看| 被下药和大狼拘h男男| 日韩久久久精品| 亚洲人人视频| 色大师av一区二区三区| 四虎影视免费永久观看在线| 免费网站成人|