久久成人a-久久加勒比-成人无号精品一区二区三区-国产精品男女啪啪-国产精品丝袜无码不卡一区-中年熟妇的大黑p-中文天堂网www新版资源在线-亚洲黄色成人网-青草国产超碰人人添人人碱-亚洲综合伊人久久大杳蕉-国产福利第一页-苏小妍直播漏内裤-四虎永久免费观看-亚洲 欧洲 日韩 综合色天使-国内av一区二区

The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project
The Taicang Administrative Center and Cultural Center Project

The Taicang Administrative Center has a construction area of 168,448 square meters, with an engineering cost of 1.05 billion yuan. The project started construction in January 2007 and was put into use in December 2009. Among them, the comprehensive building has a construction area of 67,190 square meters and is a twin-tower structure with one underground floor and 25 above-ground floors. The Municipal Committee and Municipal Government building has a construction area of 17,106 square meters, with one underground floor and nine above-ground floors. The building of the People's Congress and the Chinese People's Political Consultative Conference has a floor area of 17,106, with one underground floor and nine above-ground floors. The administrative approval center has a construction area of 21,700 square meters and five floors above ground. The conference center has a construction area of 10,408 square meters and is a four-story building above ground. The archive building covers an area of 24,230 square meters and has five floors above ground. The floor area of the civil air defense basement is 24,230 square meters.




The construction area of the Media Center project is 39,105 square meters, with a total investment of 400 million yuan. The project started construction in March 2009 and is scheduled to be put into use in October 2011. The main building has 19 floors above ground and one floor underground, with a height of 79.95 meters. The podium is a four-story building with a height of 23.65 meters.




1. Preliminary procedures: Complete the feasibility study, project proposal, investment estimate, land, planning, environmental protection, construction permit, quality supervision and safety supervision procedures, etc. on schedule.


2. Bidding agency: There were a total of over a hundred bidding events for the two projects. The entire bidding process was carried out without any errors. The bidding agency work was conducted based on the principle of "fairness, openness, and impartiality" and the selection of the best candidates.


3. Quality Management: The project management department of the agency construction is equipped with various professional technicians to strictly control the quality of the project from the aspects of design and construction. The acoustic studio of the media center has very high requirements for noise. However, some air-conditioned machine rooms are located next to the recording studio, and the design does not specify the noise reduction of the air conditioners or the air-conditioned machine rooms. The project department put forward suggestions and at the same time suggested that professional units be hired to carry out noise reduction and sound insulation treatment of the air-conditioned machine rooms, so that the impact of air conditioners on the acoustic rooms meets the requirements. The air conditioning machine room was designed without floor drains, and there was no place to drain the condensate water. The project department discovered this early and took measures in advance. The design of the dressing room did not take into account water supply and drainage or hot water, and a solution was proposed. All design changes and on-site adjustments are organized and led by the project management department.


4. Investment Management: We attach great importance to the control of project investment, strictly control on-site visa and design changes, and strictly follow the visa procedures to control on-site visa. We have also assigned full-time cost engineers. The changes and visas for the two projects were all controlled within 10% of the contract amount, and the investment control effect was quite obvious.


5. Progress Management: The construction unit is required to formulate the overall construction progress plan, monthly progress plan and weekly progress plan in accordance with the completion time requirements. The project department under the agency construction checks the completion status of the progress plans. For those that have not been completed, the construction unit is required to explain the reasons and propose a plan for the next rush. The entire progress plan is realized by controlling the progress node plans.




The actual construction period of the Taicang Administrative Center project was two and a half years, while for a project of such a large scale, the construction period usually takes three years. The actual construction period for the Media Center project is two and a half years, while the construction period for a general radio and television building is at least three and a half years. The progress control of the two projects has achieved remarkable results.


  • Service Content

    Project management and agency construction

  • Project location:

    Suzhou City, Jiangsu Province

  • Construction unit:

    Engineering Construction Office of Taicang Municipal Administrative Center

主站蜘蛛池模板: 另类性姿势bbwbbw| 毛片h| 天天上天天干| 91中文字幕在线观看| 污视频免费在线观看网站| 91av在线视频播放| 成人免费无码大片a毛片| 欧美456| www.久久.com| av自拍在线| 韩国性经典xxxxhd| 被粗暴强迫侵犯在线观看| 国产精品老熟女视频一区二区 | 色tv国产| 亚洲男人的天堂在线视频| 涩情网址| 色中色影视| 黄色在线网页| 99爱视频在线| 免费成人av片| 天天燥日日燥| 中国绿帽羞辱hd一ⅹxx| 巨乳美女在线| 一区二区乱码| 日韩欧美一区二区在线| 欧美乱码精品一区二区三区| 久久亚洲伦理| 一级少妇淫片| 清冷男神被c的合不拢腿男男| 国产乱国产乱300精品| 国产剧情精品在线| 五月天婷婷爱| 欧美91在线| 五月婷婷在线观看| 国产亚洲精品久久久久久777| 麻豆黄网| 在线播放av网站| 国产高清网站| 乳孔很大能进去的av番号| 日本黄色短片| 天天躁日日躁bbbbb| 广东毛片| 欧美特级a| 亚洲国产成人在线观看| 伊人久久大香线蕉av一区| 亚洲视色| 激情av一区| 亚洲一区中文| 东京热加勒比无码少妇| 在线观看高h| 欧美久久久久久久久久久久| 九九热精品视频在线观看| 狠狠中文字幕| 亚洲综合成人av| 免费观看一区二区| 国产精品人人妻人人爽人人牛| 五月天综合视频| 一区二区免费在线| 久久久久网站| 欧美极品xxxx| 男女无遮挡做爰猛烈视频| 东方成人av| 亚洲av无码乱码在线观看富二代| 猛男gaygay在线观看| 久久久久亚洲AV| 国产夫妻自拍小视频| 日日爽夜夜| 经典av在线| 在线观看自拍视频| 日日摸日日干| 国产三级影院| 国产精品夜色一区二区三区| 亚洲tv在线观看| 挺进邻居老陈漂亮的娇妻| 黄p在线播放| 国产成人黄色av| 国产精品第56页| 免费一区二区三区视频在线| 亚洲影院一区二区三区| 国产精品999久久久| 日韩理论片| xxxx中国hd| 亚洲手机av| 91久久在线视频| 嫩草视频在线看| 黄色一级视频在线观看| 免费观看a毛片| a天堂av| 欧美一级在线播放| 日本伦理电影波多野结衣| 亚洲乱人伦| 麻豆传媒91| 全黄h全肉红楼梦| 国内精品人妻无码久久久影院蜜桃| 飘雪影视在线观看西瓜高清免费| 中国女人free性hd| 一二三区av| 91啪在线观看| 蜜桃精品久久久久久久免费影院|